During the mechanical reconstruction of the boiler room, a complete replacement of the control part of the system was performed. The replacement of a large number of sensors and actuators in the field and the integration of existing auxiliary systems into the control cabinets realized with SiemensPLC controllers were performed.

In addition to the local SCADA application, the data was distributed to the existing factory DCS system.