The project automated the new boiler plant of the heating plant/boiler house, which consists of three hot water boilers with accompanying equipment, two of which are biomass-fired – wood chips, and one is natural gas. Biomass boilers have a power of 0.9MW, while the natural gas boiler is 2.5MW.