Skip to content
Biomass boiler and ripening chambers in the “Industrija mesa Đurđević” facility in PećinciNS Koncept2023-02-21T14:25:58+01:00
Reconstruction of the management of steam boilers in the “Šečerana Crvenka” factoryNS Koncept2023-02-21T14:23:43+01:00
Reconstruction of dryer management in the “Šečerana Crvenka” factoryNS Koncept2023-02-20T09:28:54+01:00
Reconstruction of the switchboard management in the “Šečerana Crvenka” factoryNS Koncept2023-02-20T09:27:20+01:00
Reconstruction of heating substations through the USAID program in the city heating plant in SomborNS Koncept2023-02-21T14:22:03+01:00
Cogeneration plant at Toplana “Jug”, Novi SadNS Koncept2022-01-27T14:40:34+01:00
Replacement of the circulation plant at Toplana “Zapad”, Novi SadNS Koncept2022-01-27T14:37:35+01:00
Gas boiler room within the compressor station on section 5 of the main gas pipeline (interconnector), Bulgarian border – Hungarian border, near Velika PlanaNS Koncept2022-01-27T14:36:25+01:00
Reconstruction of the management and supervision system “GRS”, Novi SadNS Koncept2022-01-27T14:23:35+01:00
Development of control and management system for silo “Žitar”, VrbasNS Koncept2022-01-27T14:20:33+01:00
Preparation of complete electrical installation, monitoring and control system, project-technical documentation for measurement and regulation and commissioning of three transport pipelines for connection of main gas pipeline (interconnector) border of Bulgaria – Hungary border with transport system of PE “Srbijagas” Karadjordjevo brdo, MS3-GRC Pancevo, MS4-GRC Gospodjinci)NS Koncept2022-01-27T14:17:38+01:00
Distribution cabinet of electric power and electric motor drive of the boiler room, “Carnex”, VrbasNS Koncept2022-01-27T14:14:31+01:00
Page load link